TM 5-3805-291-23-2
CYLINDER HEAD REPLACEMENT - CONTINUED
0172 00
INSTALLATION - CONTINUED
a.
Tighten bolt (1) through bolt (26) in numerical sequence as shown to 125 7 lb-ft (170 10 Nm).
b.
Tighten bolt (1) through bolt (26) again in numerical sequence as shown to 125 7 lb-ft (170 10 Nm).
c.
Place a mark on bolt (1) through bolt (26). Rotate bolt (1) through bolt (26) in numerical sequence. Rotate bolts
clockwise 120 5 degrees (1/3 turn).
d.
Loosen bolt (1) through bolt (26) until washers are loose under bolt heads.
e.
Tighten bolt (1) through bolt (26) in numerical sequence as shown to 125 7 lb-ft (170 10 Nm).
f.
Tighten bolt (1) through bolt (26) again in numerical sequence as shown to 125 7 lb-ft (170 10 Nm).
g.
Place a mark on bolt (1) through bolt (26). Rotate bolt (1) through bolt (26) in numerical sequence. Rotate bolts
clockwise 120 5 degrees (1/3 turn).
h.
Tighten bolt (27) through bolt (33) in numerical sequence as shown to 41 7 lb-ft (55 10 Nm).
427-C0546
0172 00-7