• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
REAR AXLE REPLACEMENT - CONTINUED
REAR AXLE TRUNNION REPLACEMENT - CONTINUED

Field Maintenance Manual 2 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  1042    1043    1044    1045    1046  1047  1048    1049    1050    1051    1052  
img
. . . . . . . . . .
8
TM 5-3805-291-23-2
REAR AXLE TRUNNION REPLACEMENT
0209 00
THIS WORK PACKAGE COVERS
Removal, Cleaning and Inspection, Installation
INITIAL SETUP
Maintenance Level
Materials/Parts - Continued
Rag, wiping (Item 35, WP 0233 00)
Direct Support
Bearing
Tools and Special Tools
Lip seal
Tool kit, general mechanic's, automotive (Item 90,
Personnel Required
WP 0232 00)
MOS 62B, Construction Equipment Repairer (2)
Shop equipment, automotive maintenance and
References
repair: field maintenance, basic, less power (Item
68, WP 0232 00)
TM 5-3805-291-10
Lifting equipment, 150-lb capacity
Equipment Conditions
Rear axle removed (WP 0208 00)
Materials/Parts
Drawings Required
Cleaning compound, solvent, type III (Item 7, WP
0233 00)
TM 5-3805-291-23P, Figures 98 and 99
Gasket cement (Item 14, WP 0233 00)
Estimated Time to Complete Task
14.0 hr
Grease, multipurpose (Item 18, WP 0233 00)
REMOVAL
N OT E
Mark bolts and hole locations to ensure correct assembly.
1.
Remove six bolts (1), washers (2), and cover (3) from
rear support (4).
427-C0514
0209 00-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.