• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
MAIN HYDRAULIC CONTROL VALVE REMOVAL - CONTINUED
MAIN HYDRAULIC CONTROL VALVE REMOVAL - CONTINUED

Field Maintenance Manual 2 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  1140    1141    1142    1143    1144  1145  1146    1147    1148    1149    1150  
img
TM 5-3805-291-23-2
MAIN HYDRAULIC CONTROL VALVE REPLACEMENT - CONTINUED
0218 00
MAIN HYDRAULIC CONTROL VALVE REMOVAL - CONTINUED
N OT E
Remove and discard all associated tiedown straps.
21.
Attach link bracket to main hydraulic control valve (20).
22.
Remove five bolts (36) and washers (37) from front and rear of main hydraulic control valve (20).
23.
Install lever puller hoist on main hydraulic control valve (20) and tilt link (38), as shown.
427-C1109
427-C1110
0218 00-5


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.