• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
SOLENOID VALVE INSTALLATION
MAIN HYDRAULIC CONTROL VALVE INSTALLATION - CONTINUED

Field Maintenance Manual 2 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  1144    1145    1146    1147    1148  1149  1150    1151    1152    1153    1154  
img
TM 5-3805-291-23-2
MAIN HYDRAULIC CONTROL VALVE REPLACEMENT - CONTINUED
0218 00
MAIN HYDRAULIC CONTROL VALVE INSTALLATION
WARN I N G
Use extreme caution when handling heavy parts. Provide adequate support and use assistance during pro-
cedure. Ensure that any lifting equipment used is in good condition and of suitable load capacity. Keep
clear of heavy parts supported only by lifting equipment. Failure to follow this warning may result in injury
or death to personnel.
N OT E
Main hydraulic control valve weighs 525 lb (238 kg).
Apply a thin coat of clean oil to all O-rings before installation.
1.
Attach link bracket to main hydraulic control valve (20).
2.
Attach lever puller hoist to link bracket and tilt cylin-
der (39).
427-C1112
0218 00-9


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.