• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
AIR CONDITIONING SYSTEM COMPRESSOR REPLACEMENT - CONTINUED
AIR CONDITIONING SYSTEM SERVICE

Field Maintenance Manual 2 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  1155    1156    1157    1158    1159  1160  1161    1162    1163    1164    1165  
img
.
TM 5-3805-291-23-2
AIR CONDITIONING SYSTEM COMPRESSOR REPLACEMENT - CONTINUED
0221 00
INSTALLATION - CONTINUED
N OT E
Apply a thin coat of clean refrigerant oil to all O-rings prior to installation.
4.
Install two new O-rings (4) and hoses (3) on fittings (5).
5.
Connect wiring harness (1) to sensor (2).
6.
Install serpentine belt (WP 0048 00).
7.
Recharge AC system (WP 0222 00).
8.
Install side cover (TM 5-3805-291-10).
9.
Close engine hood (TM 5-3805-291-10).
WAR N I N G
Before operating the machine, secure the steering frame lock in the stowed position. DO NOT operate
machine with steering frame lock connected. Failure to lock steering frame lock into the stowed position
before operating can result in loss of steering and injury or death to personnel.
10.
Secure steering frame lock in stowed position (TM 5-3805-291-10).
11.
Start engine (TM 5-3805-291-10).
12.
Verify AC system operation (TM 5-3805-291-10).
13.
Shut down engine (TM 5-3805-291-10).
END OF WORK PACKAGE
0221 00-3/(0221 00-4 Blank)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.