INLINE REFRIGERANT DRYER REPLACEMENT - CONTINUED
0224 00
INSTALLATION - CONTINUED
5.
Install new O-ring (2) in tube (1) and connect tube to
inline refrigerant dryer (3).
WAR N I N G
Before operating the machine, secure the steering frame lock in the stowed position. DO NOT operate
machine with steering frame lock connected. Failure to lock steering frame lock into the stowed position
before operating can result in loss of steering and injury or death to personnel.
6.
Secure steering frame lock in stowed position (TM 5-3805-291-10).
7.
Run engine until normal temperature is reached (TM 5-3805-291-10).
8.
Shut down engine (TM 5-3805-291-10).
9.
Charge AC system (WP 0222 00).
10.
Verify correct operation of AC system (TM 5-3805-291-10).
11.
Install side cover (WP 0135 00).
12.
Close hood (TM 5-3805-291-10).
END OF WORK PACKAGE