• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
BUCKET LIFT ARMS REPLACEMENT - CONTINUED
BUCKET LIFT ARMS REPLACEMENT - CONTINUED

Field Maintenance Manual 2 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  1218    1219    1220    1221    1222  1223  1224    1225    1226    1227    1228  
img
TM 5-3805-291-23-2
BUCKET LIFT ARMS REPLACEMENT - CONTINUED
0229 00
REMOVAL - CONTINUED
N OT E
Tag hoses prior to removal to ensure correct installation.
Use a container to catch any fluid that may drain from hoses or system. Dispose of fluid IAW local pol-
icy and ordinances. Ensure all spills are cleaned up.
9.
Disconnect tube assembly (13) from fitting (14).
10.
Remove fitting (14) from lift arm (1). Remove two
O-rings (15) from fitting. Discard O-rings.
11.
Repeat steps 7 thru 10 for other side of machine.
427-C1169
12.
Remove four bolts (16) and washers (17) and
disconnect hose assembly (18) from fitting (19).
13.
Remove O-ring (20) from hose assembly (18). Discard
O-ring.
14.
Repeat steps 12 and 13 for other side of machine.
427-C1170
0229 00-4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.