• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
BUCKET TILT LEVER AND LINK REPLACEMENT - CONTINUED
BUCKET TILT LEVER AND LINK REPLACEMENT - CONTINUED

Field Maintenance Manual 2 For Loader, Heavy, Scoop: Diesel Engine Driven (Ded), 4-Wheel Drive 4.5 Cubic Yard Rock Bucket And 5.0 Cubic Yard General Purpose Bucket
Page Navigation
  1213    1214    1215    1216    1217  1218  1219    1220    1221    1222    1223  
img
. .
TM 5-3805-291-23-2
BUCKET TILT LEVER AND LINK REPLACEMENT - CONTINUED
0228 00
INSTALLATION - CONTINUED
Tilt Link
0228 00
N OT E
Items 10, 36, 47, 52, 57, 82, and 94 (WP
0232 00) are assembled to make puller
assembly as shown.
1.
Lower temperature of all bearings (11) before installa-
tion.
2.
Using puller assembly, install bearing (11) in bucket
tilt link (1) to a depth of 0.39 0.04 in. (10.0 1.0
mm). Repeat this step for opposite end of bucket tilt
link.
427-C1128
3.
Use bushing driver set to install new lip seal (10) in
each side of bucket tilt link (1). Repeat this step for
opposite end of bucket tilt link.
427-C1127
WARN I N G
Use extreme caution when handling heavy parts. Provide adequate support and use assistance during pro-
cedure. Ensure that any lifting equipment used is in good condition and of suitable load capacity. Keep
clear of heavy parts supported only by lifting equipment. Failure to follow this warning may result in injury
or death to personnel.
N OT E
Bucket tilt link weighs 140 lb (64 kg).
0228 00-14


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.