• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 11. Clamp.
Figure 13. Wiring Harness and Hoses.

Field Maintenance Manual For M400T And M400W
Page Navigation
  752    753    754    755    756  757  758    759    760    761    762  
img
.
TM 5-3805-292-23
0109
INSTALLATION CONTINUED
N OT E
Route hoses as noted during removal.
Install hoses as tagged during removal.
7. Install new O-ring (Figure 12, Item 3) and connect hose (Figure 12, Item 2) to A/C compressor (Figure 12,
Item 1).
8. Install new O-ring (Figure 12, Item 3) and connect hose (Figure 12, Item 4) to A/C compressor (Figure 12,
Item 1).
9. Install new tiedown straps (Figure 12, Item 5).
2
1
1
3 (HIDDEN)
4
5
458-0820
Figure 12. A/C Compressor.
0109
0109-10


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.