• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 64. Bracket Link.
Figure 66. Driveshaft.

Field Maintenance Manual For 924H Wheel Loader -2 Page Navigation
  564    565    566    567    568  569  570    571    572    573    574  
img
.
TM 5-3805-298-23-2
0177
INSTALLATION CONTINUED
CAUTION
Remove all caps from hydraulic openings and component connections during installation.
Failure to follow this caution may result in damage to equipment.
NOTE
Install hoses and tubes as noted during removal.
16. Install new O-ring (Figure 65, Item 4) from line (Figure 65, Item 7).
17. Install two new O-rings (Figure 65, Items 2 and 6) from line (Figure 65, Item 7).
18. Install line (Figure 65, Item 7) on machine, and tighten three tube nuts (Figure 65, Items 1 and 5).
Figure 65. Line and Fittings.
0177
0177-58


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.