• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 55. Starter Cables.
Figure 1. Tube.

Field Maintenance Manual For 924H Wheel Loader -2 Page Navigation
  652    653    654    655    656  657  658    659    660    661    662  
img
. .
10
TM 5-3805-298-23-2
0179
FIELD MAINTENANCE
-
ENGINE MOUNT REPLACEMENT
0179
Removal, Cleaning and Inspection, Installation
INITIAL SETUP
Materials/Parts
Tools and Special Tools
0
0
Tool Kit, General Mechanic's
Rag, Wiping (WP 0430, Item 27)
0
(WP 0431, Item 162)
Tiedown Strap, Electrical Components
0
Adapter, 3/4" Drive Female to 1/2" Drive Male
(WP 0430, Item 40)
0
(WP 0431, Item 3)
O-ring, Seal 9X-7385
0
Extension, Impact, 1/2" Drive, 3" Long
(WP 0432, Item 165) (2)
0
(WP 0431, Item 45)
0
Personnel Required
0
Handle, 3/4" Drive, 19-1/4" Long, w/Lock But-
Two
ton (WP 0431, Item 66)
0
0
Head, Ratchet, 3/4" Drive, Sealed Head
References
0
(WP 0431, Item 70)
0
WP 0172
0
Socket, Impact, 1/2" Drive, 6 Point, 1 3/16"
(WP 0431, Item 130)
Equipment Conditions
0
0
Wrench, Box 1 1/8" and 1 3/16"
Machine parked (TM 5-3805-298-10)
0
(WP 0431, Item 172)
0
Cooling module enclosure removed
Wrench, Box, 12 Point, 22mm and 24mm
(WP 0341)
0
(WP 0431, Item 173)
0
Estimated Time to Complete
Lifting device (1,000-lb capacity)
0
0
19.5 Hr
0
0179-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.