TM 5-3805-298-23-4
0370
REMOVAL CONTINUED
2. Loosen tube nut (Figure 2, Item 9) and remove hose (Figure 2, Item 1) and O-ring (Figure 2, Item 8) from fitting
(Figure 2, Item 7). Discard O-ring.
3. Loosen tube nut (Figure 2, Item 5) and remove hose (Figure 2, Item 6) and O-ring (Figure 2, Item 4) from tee
fitting (Figure 2, Item 3). Discard O-ring.
4. Loosen clamp (Figure 2, Item 2) and remove hose (Figure 2, Item 10) from tee fitting (Figure 2, Item 3).
Figure 2. Implement Pump Connections.
0370
5. Remove four bolts (Figure 3, Item 1), washers (Figure 3, Item 2), split flange (Figure 3, Item 6), hose
(Figure 3, Item 4) and O-ring (Figure 3, Item 3) from implement pump (Figure 3, Item 5). Discard O-ring.
Figure 3. Implement Pump Connections.
0370