• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 1. Measuring Fuel Flow.
RIGHT BATTERY BOX REMOVAL

Field Maintenance Manual For 924H Wheel Loader -4 Page Navigation
  334    335    336    337    338  339  340    341    342    343    344  
img
. . . . . . . .
26
TM 5-3805-298-23-4
0397
FIELD MAINTENANCE
-
ARCTIC BATTERY BOX REPLACEMENT
0397
Right Battery Box Removal, Left Battery Box and NATO Slave Removal, Cleaning and Inspection, Left
Battery Box and NATO Slave Installation, Right Battery Box Installation
INITIAL SETUP
Personnel Required
Tools and Special Tools
0
0
Tool Kit, General Mechanic's
Two
0
(WP 0431, Item 162)
0
References
0
Gloves, Rubber
WP 0172
(WP 0431, Item 63)
0
0
WP 0174
Goggles
0
0
Equipment Conditions
Materials/Parts
0
0
Machine parked (TM 5-3805-298-10)
Rag, Wiping (WP 0430, Item 27)
0
0
Tag, Marker (WP 0430, Item 35)
Estimated Time to Complete
0
0
Tiedown Strap, Electrical Components
3.0 Hr
0
(WP 0430, Item 40)
0
Cotter Pin, 3B-4610 (WP 0432, Item 106) (2)
0
Locknut, 8T-0389 (WP 0432, Item 153) (8)
0
0397-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.