TM 5-3805-298-23-4
0397
LEFT BATTERY BOX AND NATO SLAVE INSTALLATION CONTINUED
18. Install latch (Figure 19, Item 6), pin (Figure 19, Item 7), and new cotter pin (Figure 19, Item 5) on battery box
(Figure 19, Item 4).
19. Install cover (Figure 19, Item 1) four washers (Figure 19, Item 3), and bolts (Figure 19, Item 2) on battery box
(Figure 19, Item 4).
Figure 19. Battery Box Cover and Latch.
0397
END OF TASK