• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 14. Left Batteries.
Figure 16. NATO Slave Receptacle.

Field Maintenance Manual For 924H Wheel Loader -4 Page Navigation
  350    351    352    353    354  355  356    357    358    359    360  
img
.
TM 5-3805-298-23-4
0397
LEFT BATTERY BOX AND NATO SLAVE INSTALLATION CONTINUED
7. Install positive battery cable (Figure 15, Item 8), three cable clamps (Figure 15, Item 6), and nuts
(Figure 15, Item 5) on three batteries (Figure 15, Item 7).
8. Install positive battery cable (Figure 15, Item 4), washer (Figure 15, Item 3), and nut (Figure 15, Item 2) on
cable clamp (Figure 15, Item 6).
9. Position three boots (Figure 15, Item 1) on three cable clamps (Figure 15, Item 6).
Figure 15. Left Positive Battery Cable.
0397
0397-17


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.