Figure 3. Operator Controls.
Figure 2. Fuel Connection.

Field Maintenance Manual For 924H Wheel Loader -4 Page Navigation
  401    402    403    404    405  406  407    408    409    410    411  
img
. . . . . . .
10
TM 5-3805-298-23-4
0402
FIELD MAINTENANCE
-
ARCTIC HEATER AND BRACKET REPLACEMENT
0402
Removal, Cleaning and Inspection, Installation
INITIAL SETUP
References
Tools and Special Tools
0
0
Tool Kit, General Mechanic's
WP 0172
0
(WP 0431, Item 162)
0
Equipment Conditions
0
Materials/Parts
0
Machine parked (TM 5-3805-298-10)
0
Rag, Wiping (WP 0430, Item 27)
0
Coolant drained (WP 0228)
0
Sealing Compound (Pipe Thread)
Right ladder and right lower
(WP 0430, Item 28)
0
cab access panels removed (WP 0347)
0
Tag, Marker (WP 0430, Item 35)
0
Estimated Time to Complete
Tiedown Strap, Electrical Components
0
(WP 0430, Item 40)
7.5 Hr
0
0
REMOVAL
000402
NOTE
Tag and mark electrical connectors and note cable routing to aid installation.
1. Remove tiedown strap (Figure 1, Item 2) and disconnect arctic heater wiring harness (Figure 1, Item 3) from
arctic heater (Figure 1, Item 1). Discard tiedown strap.
Figure 1. Arctic Heater Wiring Harness.
0402
0402-1