• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
GENERAL PMCS PROCEDURES
Table 1. Preventive Maintenance Checks and Services (PMCS)

Tractor, Wheeled, Industrial Backhoe Loader Nsn 2420-01-532-3399
Page Navigation
  1    2    3    4  5  6    7    8    9    10  
img
. . . . . . . . . . . . . . . . .
16
TM 5-2420-231-23-2
0088
FIELD MAINTENANCE
-
PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) AND LUBRICATION INSTRUCTIONS
00
88
INITIAL SETUP
Tools and Special Tools
References - Continued
Tool Kit, General Mechanic's
WP 0147
0
0
(WP 0376, Item 117)
WP 0157
0
WP 0158
Materials/Parts
0
WP 0205
Rag, Wiping (WP 0375, Item 25)
0
0
WP 0216
0
References
WP 0220
0
TM 9-6140-200-14
WP 0268
0
0
WP 0085
WP 0301
0
0
WP 0090
WP 0308
0
0
WP 0095
WP 0347
0
0
WP 0100
WP 0364
0
0
WP 0101
WP 0367
0
0
WP 0110
0
Equipment Conditions
WP 0126
0
Machine parked (TM 5-2420-231-10)
WP 0136
0
0
Table 1. Preventive Maintenance Checks and Services (PMCS).
0088
LOCATION
ITEM TO
CHECK/
MAN-
EQUIPMENT NOT
ITEM
SERVICE
NO.
INTERVAL
HOURS
PROCEDURE
READY/AVAILABLE IF:
NOTE
Review all WARNINGs, CAUTIONs, and NOTEs before
performing PMCS on the Backhoe Loader (BHL).
Unless otherwise indicated, perform all preventive main-
tenance and lubrication with machine parked on level
ground, engine shut down, parking brake engaged, and
hydraulic system pressure relieved.
Ensure Operator PMCS is completed prior to Field
PMCS.
1
Initial 50
0.3
Engine Oil
Replace engine oil and filter (WP
Hours
0126).
0088-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.