16
TM 5-2420-231-23-2
FIELD MAINTENANCE
-
PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) AND LUBRICATION INSTRUCTIONS
00
88
INITIAL SETUP
Tools and Special Tools
References - Continued
Tool Kit, General Mechanic's
0
0
(WP 0376, Item 117)
0
Materials/Parts
0
Rag, Wiping (WP 0375, Item 25)
0
0
0
References
0
TM 9-6140-200-14
WP 0268
0
0
WP 0085
WP 0301
0
0
WP 0308
0
0
WP 0347
0
0
WP 0364
0
0
WP 0367
0
0
0
Equipment Conditions
0
Machine parked (TM 5-2420-231-10)
0
0
Table 1. Preventive Maintenance Checks and Services (PMCS).
0088
LOCATION
ITEM TO
CHECK/
MAN-
EQUIPMENT NOT
ITEM
SERVICE
NO.
INTERVAL
HOURS
PROCEDURE
READY/AVAILABLE IF:
NOTE
Review all WARNINGs, CAUTIONs, and NOTEs before
performing PMCS on the Backhoe Loader (BHL).
Unless otherwise indicated, perform all preventive main-
tenance and lubrication with machine parked on level
ground, engine shut down, parking brake engaged, and
hydraulic system pressure relieved.
Ensure Operator PMCS is completed prior to Field
PMCS.
1
Initial 50
0.3
Engine Oil
Replace engine oil and filter (WP
Hours