• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 1. Hand Throttle Assembly.
THROTTLE CABLES REPLACEMENT

Tractor, Wheeled, Industrial Backhoe Loader Nsn 2420-01-532-3399
Page Navigation
  324    325    326    327    328  329  330    331    332    333    334  
img
.
TM 5-2420-231-23-2
0139
CLEANING AND INSPECTION
0139
Clean and inspect all parts IAW Mechanical General Maintenance Instructions (WP 0369).
END OF TASK
INSTALLATION
0139
1. Install knob (Figure 1, Item 6) from lever (Figure 1, Item 7).
NOTE
Tighten as necessary to allow proper operation of throttle lever.
Install lever and washers in position and orientation noted during removal.
2. Install bolt (Figure 1, Item 9), washer (Figure 1, Item 8), lever (Figure 1, Item 7), three spring tension washers
(Figure 1, Item 5), washer (Figure 1, Item 4), and two nuts (Figure 1, Item 3) on machine.
3. Install cable (Figure 1, Item 12), washer (Figure 1, Item 2), and new cotter pin (Figure 1, Item 1) on lever
(Figure 1, Item 7).
4. Install cable (Figure 1, Item 12) on bracket (Figure 1, Item 10) and tighten two jamnuts (Figure 1, Item 11).
END OF TASK
FOLLOW-ON TASKS
0139
Install instrument panel right-side cover (rear) (WP 0176).
END OF TASK
END OF WORK PACKAGE
0139-3/(4 blank)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.