18
TM 5-2420-231-23-2
FIELD MAINTENANCE
-
THROTTLE CABLES REPLACEMENT
0140
Removal, Cleaning and Inspection, Installation
INITIAL SETUP
References - Continued
Tools and Special Tools
Tool Kit, General Mechanic's
WP 0374 (Group Number 0202 and 0203)
0
0
(WP 0376, Item 117)
Personnel Required
Materials/Parts
Two
0
Rag, Wiping (WP 0375, Item 25)
0
Equipment Conditions
Tag, Marker (WP 0375, Item 33)
0
Air cleaner barrier curtain removed (WP 0099)
Tiedown Strap (WP 0375, Item 35)
0
0
Instrument panel right-side cover removed
Cotter Pin (3)
0
0
Locknut
0
Front floor cover plate removed (WP 0306)
0
Lockwasher (4)
0
0
References
Estimated Time to Complete
WP 0085
0
10.5 hr
0
WP 0369
0
REMOVAL
0140
NOTE
Note location and quantity of tiedown straps to aid in installation.
1. Remove two bolts (Figure 1, Item 2), lockwashers (Figure 1, Item 3), washers (Figure 1, Item 4), and mounting
bracket (Figure 1, Item 1) from floor. Discard lockwashers.
Figure 1. Throttle Cable Bracket Bolts.
0140