• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
COLD START TEMPERATURE SWITCH REPLACEMENT
FUEL SHUTOFF WIRING HARNESS REPLACEMENT

Tractor, Wheeled, Industrial Backhoe Loader Nsn 2420-01-532-3399
Page Navigation
  364    365    366    367    368  369  370    371    372    373    374  
img
. .
TM 5-2420-231-23-2
0143
CLEANING AND INSPECTION
0143
1. Clean and inspect all parts IAW Mechanical General Maintenance Instructions (WP 0369).
2. Clean and inspect all parts IAW Electrical General Maintenance Instructions (WP 0370).
END OF TASK
INSTALLATION
0143
1. Apply teflon tape to cold start temperature switch (Figure 2, Item 2), and install switch on engine.
2. Connect wiring harness connector (Figure 2, Item 1) to cold start temperature switch (Figure 2, Item 2) and
install new tiedown strap (Figure 2, Item 3).
Figure 2. Cold Start Temperature Switch.
0143
END OF TASK
FOLLOW-ON TASKS
0143
1. Fill engine coolant (WP 0090).
2. Lower engine hood (TM 5-2420-231-10).
3. Disengage and stow safety support strut, and lower front end loader (TM 5-2420-231-10).
END OF TASK
END OF WORK PACKAGE
0143-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.