• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 7. Equalizer Cover.
Figure 10. Battery Cover.

Tractor, Wheeled, Industrial Backhoe Loader Nsn 2420-01-532-3399
Page Navigation
  452    453    454    455    456  457  458    459    460    461    462  
img
.
TM 5-2420-231-23-2
0158
INSTALLATION CONTINUED
12. Connect positive battery cable (Figure 9, Item 8) to battery (Figure 9, Item 7) and tighten nut (Figure 9, Item 9).
13. Connect battery tie cable (Figure 9, Item 6) to battery (Figure 9, Item 7) and tighten nut (Figure 9, Item 5).
14. Install battery lug (Figure 9, Item 13) on battery (Figure 9, Item 4) and tighten nut (Figure 9, Item 12).
15. Connect battery tie cable (Figure 9, Item 6), positive battery cable (Figure 9, Item 11) and install nut (Figure 9,
Item 10) on battery tie cable (Figure 9, Item 6).
16. Connect negative battery cable (Figure 9, Item 2) to battery (Figure 9, Item 4) and tighten nut
(Figure 9, Item 3).
17. Position four cable connection covers (Figure 9, Item 1) over battery terminals.
Figure 9. Battery Cable Connection.
0158
0158-9


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.