• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 5. Grid Heater.
Figure 8. Wiring Harness Connections.

Tractor, Wheeled, Industrial Backhoe Loader Nsn 2420-01-532-3399
Page Navigation
  489    490    491    492    493  494  495    496    497    498    499  
img
.
TM 5-2420-231-23-2
0161
CLEANING AND INSPECTION
0161
1. Clean and inspect all parts IAW Mechanical General Maintenance Instructions (WP 0369).
2. Clean and inspect all parts IAW Electrical General Maintenance Instructions (WP 0370).
END OF TASK
INSTALLATION
0161
NOTE
Install wires as tagged and marked during removal.
1. Connect grid heater jumper harness (Figure 6, Item 4) to grid heater (Figure 6, Item 2).
2. Install nut (Figure 6, Item 1) on grid heater (Figure 6, Item 2).
3. Connect grid heater jumper harness connector (Figure 6, Item 4) to grid heater wiring harness
(Figure 6, Item 3).
Figure 6. Grid Heater.
0161
0161-5


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.