• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 9. Mounting Bolts.
FRONT CONSOLE WIRING HARNESS REPLACEMENT

Tractor, Wheeled, Industrial Backhoe Loader Nsn 2420-01-532-3399
Page Navigation
  492    493    494    495    496  497  498    499    500    501    502  
img
. . .
TM 5-2420-231-23-2
0161
INSTALLATION CONTINUED
11. Connect grid heater wiring harness (Figure 10, Item 2) to main chassis wiring harness (Figure 10, Item 3).
NOTE
Install tiedown straps in location and quantity as noted during removal.
12. Install new tiedown straps (Figure 10, Item 1) along grid heater wiring harness (Figure 10, Item 2).
Figure 10. Main Chassis Wiring Harness Connector.
0161
END OF TASK
FOLLOW-ON TASKS
0161
1. Install air cleaner barrier curtain (WP 0099).
2. Connect batteries (WP 0157).
END OF TASK
END OF WORK PACKAGE
0161-8


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.