• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 2. Tower Pilot Wiring Harness.
BACKHOE PILOT CONTROL SWITCHES REPLACEMENT

Tractor, Wheeled, Industrial Backhoe Loader Nsn 2420-01-532-3399
Page Navigation
  703    704    705    706    707  708  709    710    711    712    713  
img
.
TM 5-2420-231-23-2
0188
INSTALLATION CONTINUED
4. Install two pilot control switches (Figure 3, Item 2) on right backhoe control tower boot (Figure 3, Item 1).
Figure 3. Pilot Control Switches.
0188
END OF TASK
FOLLOW-ON TASKS
0188
Install right-hand backhoe control tower boot (WP 0287).
END OF TASK
END OF WORK PACKAGE
0188-3/(4 blank)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.