• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
BACKHOE PILOT CONTROL SWITCHES REPLACEMENT
Figure 3. Pilot Control Switches.

Tractor, Wheeled, Industrial Backhoe Loader Nsn 2420-01-532-3399
Page Navigation
  705    706    707    708    709  710  711    712    713    714    715  
img
.
TM 5-2420-231-23-2
0189
REMOVAL CONTINUED
NOTE
Tag and mark wires to aid in installation.
2. Disconnect two wiring harness connectors (Figure 2, Item 1) from pilot control switches (Figure 2, Item 2).
3. Remove pilot control switches (Figure 2, Item 2) from machine.
Figure 2. Pilot Control Switches Connectors.
0189
END OF TASK
CLEANING AND INSPECTION
0189
1. Clean and inspect all parts IAW Mechanical General Maintenance Instructions (WP 0369).
2. Clean and inspect all parts IAW Electrical General Maintenance Instructions (WP 0370).
END OF TASK
INSTALLATION
0189
1. Position pilot control switches (Figure 2, Item 2) on machine.
2. Connect two wiring harness connectors (Figure 2, Item 1) to pilot control switches (Figure 2, Item 2).
0189-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.