• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 3. Pilot Control Switches.
Figure 2. Pilot Control Switches Connectors.

Tractor, Wheeled, Industrial Backhoe Loader Nsn 2420-01-532-3399
Page Navigation
  704    705    706    707    708  709  710    711    712    713    714  
img
. . .
4
TM 5-2420-231-23-2
0189
FIELD MAINTENANCE
-
BACKHOE PILOT CONTROL SWITCHES REPLACEMENT
0
189
Removal, Cleaning and Inspection, Installation
INITIAL SETUP
References - Continued
Tools and Special Tools
Tool Kit, General Mechanic's
WP 0370
0
0
(WP 0376, Item 117)
WP 0374 (Group Number 0316)
0
Materials/Parts
Equipment Conditions
Rag, Wiping (WP 0375, Item 25)
Machine parked (TM 5-2420-231-10)
0
0
Tag, Marker (WP 0375, Item 33)
Batteries disconnected (WP 0157)
0
0
References
Estimated Time to Complete
WP 0369
0.2 hr
0
0
REMOVAL
0189
1. Remove pilot control switches (Figure 1, Item 1) from right backhoe control tower (Figure 1, Item 2).
Figure 1. Pilot Control Switches.
0189
0189-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.