Figure 1. Backhoe Boom Cylinder Tubes.
BACKHOE SWING TOWER HOSES REPLACEMENT

Tractor, Wheeled, Industrial Backhoe Loader Nsn 2420-01-532-3399
Page Navigation
  128    129    130    131    132  133  134    135    136    137    138  
img
.
TM 5-2420-231-23-3
0243
INSTALLATION
0243
NOTE
Remove plugs and caps from hoses and fittings.
Install hydraulic lines as tagged and marked during removal.
1. Connect backhoe boom cylinder tube (Figure 1, Item 5) to hydraulic hose (Figure 1, Item 15).
2. Connect backhoe boom cylinder tube (Figure 1, Item 5) to hydraulic hose (Figure 1, Item 7).
3. Connect backhoe boom cylinder tube (Figure 1, Item 4) to hydraulic hose (Figure 1, Item 16).
4. Connect backhoe boom cylinder tube (Figure 1, Item 4) to hydraulic hose (Figure 1, Item 6).
5. Install two spacers (Figure 1, Item 12), clamp (Figure 1, Item 3), bolts (Figure 1, Item 13), clamps (Figure 1,
Item 11), and new locknuts (Figure 1, Item 10) on machine.
6. Install two spacers (Figure 1, Item 2), clamp (Figure 1, Item 1), two clamps (Figure 1, Item 8), bolts (Figure 1,
Item 14), and new locknuts (Figure 1, Item 9).
END OF TASK
FOLLOW-ON TASKS
0243
Install backhoe boom cylinder (WP 0274).
END OF TASK
END OF WORK PACKAGE
0243-3/(4 blank)