• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 14. Wrist Rest.
BACKHOE CONTROL TOWER LEVERS AND CABLE MAINTENANCE

Tractor, Wheeled, Industrial Backhoe Loader Nsn 2420-01-532-3399
Page Navigation
  522    523    524    525    526  527  528    529    530    531    532  
img
. .
TM 5-2420-231-23-3
0287
LEFT TOWER BOOT INSTALLATION CONTINUED
10. Install washer (Figure 15, Item 3) and knob (Figure 15, Item 2) on tower (Figure 15, Item 1).
Figure 15. Knob.
0287
END OF TASK
FOLLOW-ON TASKS
0287
1. Install rear floor cover plate (WP 0306).
2. Connect batteries (WP 0157).
END OF TASK
END OF WORK PACKAGE
0287-15/(16 blank)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.