• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
LEFT TOWER BOOT INSTALLATION CONTINUED
Figure 2. Cotter Pin and Cable.

Tractor, Wheeled, Industrial Backhoe Loader Nsn 2420-01-532-3399
Page Navigation
  523    524    525    526    527  528  529    530    531    532    533  
img
. . . . . . .
12
TM 5-2420-231-23-3
0288
FIELD MAINTENANCE
-
BACKHOE CONTROL TOWER LEVERS AND CABLE MAINTENANCE
028
8
Removal, Cleaning and Inspection, Installation, Adjustment
INITIAL SETUP
References
Tools and Special Tools
Tool Kit, General Mechanic's
WP 0369
0
0
(WP 0376, Item 117)
WP 0374 (Group Number 0811)
0
Materials/Parts
Equipment Conditions
Rag, Wiping (WP 0375, Item 25)
Right backhoe control tower boot removed
0
0
Cotter Pin (2)
(WP 0287)
0
Locknut (2)
Estimated Time to Complete
0
Lockwasher
0
3.0 hr
0
REMOVAL
0288
1. Remove retainer clip (Figure 1, Item 1) from gas strut (Figure 1, Item 3).
2. Remove gas strut (Figure 1, Item 3) from rod end track (Figure 1, Item 2).
Figure 1. Gas Strut.
0288
0288-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.