TM 5-2420-231-23-3
0354
INSTALLATION CONTINUED
2. Install new gasket (Figure 8, Item 6), heater tube bracket (Figure 8, Item 4), and four bolts (Figure 8, Item 5) on
heater tubes (Figure 8, Item 2).
3. Install two bolts (Figure 8, Item 8) and nuts (Figure 8, Item 3) on heater tube bracket (Figure 8, Item 4).
4. Connect two heater hoses (Figure 8, Item 1) to heater tubes (Figure 8, Item 2).
5. Slide two hose clamps (Figure 8, Item 7) toward heater tubes (Figure 8, Item 2).
Figure 8. Heater Tubes.
0354