TM 5-2420-231-23-3
0366
INSTALLATION CONTINUED
1. Remove A/C compressor fill plug (Figure 5, Item 1) and O-ring (Figure 5, Item 2) from A/C compressor
(Figure 5, Item 3). Drain any refrigerant oil from A/C compressor into suitable container. Dispose of refrigerant
oil and O-ring.
2. Add 6.7 oz (198 mL) of fresh refrigerant oil from a sealed container to A/C compressor (Figure 5, Item 3).
3. Lubricate new O-ring (Figure 5, Item 2) and install O-ring and fill plug (Figure 5, Item 1) on A/C compressor
(Figure 5, Item 3).
Figure 5. Compressor Fill Plug.
0366
4. Route A/C compressor clutch wire (Figure 6, Item 6) though hole (Figure 6, Item 5) in A/C compressor mount-
ing bracket (Figure 6, Item 4).
5. Line up alignment pins (Figure 6, Item 3) on A/C compressor mounting bracket (Figure 6, Item 4) with recess
(Figure 6, Item 2) in A/C compressor (Figure 6, Item 1). Install A/C compressor on A/C compressor mounting
bracket (Figure 6, Item 4).
Figure 6. Mounting Bracket.
0366