• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 6. Cylinder Head.
Figure 1. Injection Pump Timing Port.

Maintenance Manual For Loader, Scoop Type, Ded 4 X 4, Articulated Frame Steer, 4.5 To 5 Cu. Yd.
Page Navigation
  318    319    320    321    322  323  324    325    326    327    328  
img
. . . . . . . . . . . . .
14
TM 5-3805-255-14
0028
FIELD MAINTENANCE
-
FUEL INJECTION PUMP REPLACEMENT AND TIMING
002
8
Removal, Installation, Adjustment
INITIAL SETUP
Equipment Condition
Tools and Special Tools
0
0
Shop Equipment, Automotive Maintenance
Machine parked on level ground (WP 0005)
0
and Repair: Organizational Maintenance
Parking brake applied (WP 0005)
0
Common #1 (WP 0128, Item 14)
Engine OFF (WP 0005)
0
0
Battery disconnect switch in OFF position
Materials/Parts
0
(WP 0004)
Rag, Wiping (WP 0130, Item 28)
0
0
Engine access panels removed (WP 0005)
0
References
Emergency shutdown cable removed from fuel
0
injection pump (WP 0034)
WP 0018
0
0
Accelerator cable removed from fuel injection
WP 0020
0
pump (WP 0028)
WP 0XX
0
0
Fan guard removed (WP 0005)
0
0028-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.