Figure 1. Main Hydraulic Pump.
MAIN CONTROL VALVE REPLACEMENT

Maintenance Manual For Loader, Scoop Type, Ded 4 X 4, Articulated Frame Steer, 4.5 To 5 Cu. Yd.
Page Navigation
  695    696    697    698    699  700  701    702    703    704    705  
img
. .
TM 5-3805-255-14
0077
INSTALLATION
00077
1. Carefully align splined shaft with splined drive in torque converter.
2. Install main hydraulic pump (Figure 1, Item 5) on converter.
3. Install two new lockwashers (Figure 1, Item 7) and bolts (Figure 1, Item 6) through main hydraulic pump (Fig-
ure 1, Item 5) and converter.
4. Install two new O-rings (Figure 1, Item 4), hydraulic lines (Figure 1, Item 1), four split flanges (Figure 1, Item 3),
and eight bolts (Figure 1, Item 2) on main hydraulic pump (Figure 1, Item 5).
5. Connect line to hydraulic tank (WP 0083).
6. Check and refill hydraulic oil in reservoir (WP 0016).
END OF TASK
END OF WORK PACKAGE
0077-3/(4 blank)