TM 5-3805-258-10TRANSPORTATION HINTS35.Pull the handle on the spring loadedtrailer support jack, swing jack down tolowered position, and allow spring pin tolock .36.Tip bucket down until trailer supportjack is on ground.37.Remove four capscrews holding but:to trailer.Lift bucket up about twoback machine away from trailer, lowerbucket to ground, and shutdown machine.38.Reinstall bucket holding capscrewstrailer.Tighten securely.39.Reinstall all other components whichhave been removed for air transport.40.The machine is ready for operationStore the trailer in a safe location.74
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business