POWER TRAIN
TM 5-3805-258-24-2
DISASSEMBLY AND ASSEMBLY
24.
25.
26.
27.
28.
29.
30.
31.
TRANSMISSION
Heat bearing (32) to a maximum temperature
of 135° C (275° F) and install it on gear (33).
Make sure the bearing is installed so the groove
is toward the top.
Install ring (34) in the groove of carrier (35) as
shown.
Use tool (A) to cause expansion of the ring. Use
tooling (J) and a press to install the bearing and
gear in carrier (35). The ring must be installed
in the groove of the bearing.
Install bearings (39) in gears (38) and bearings
(43) in gears (42).
Install washers (37), gears (38) and washers
(40) in the upper carrier.
Install washers (41), gears (42) and washers
(44) in the lower carrier.
Install shafts (36) in the carrier that hold the
washers, gears and bearing in place.
Use a hammer and punch to install pins (45)
that hold the shafts in the carrier.
NOTE: If pins (45) are damaged, a replacement will
be necessary.
5-283