TM 5-3805-258-24-2
OPERATORS STATION
HYDRAULIC CONTROL
26. Install the nut and rod (35) on each solenoid
(34).
27. Put solenoids (34) in position and install the
washers and bolts to hold them to plate (36).
DISASSEMBLY AND ASSEMBLY
GROUP
28. Connect wiring harness (37) to solenoids (34).
29. Put plate (36) in position and install the
washers and bolts to hold it to console (33).
30. Install the pins and cotter pins to connect solen-
oid rods (35) to links (28).
31. See HYDRAULIC CONTROL LEVER
LINKAGE ADJUSTMENT in SPECIFICA-
TIONS or TESTING AND ADJUSTING
section for the correct adjustment of the hu-
draulic control group after it is installed.
end by:
a) install hydraulic control group
5-530