TM 5-3805-262-20
11-3. LINES AND FITTINGS MAINTENANCE (CONT)
f. L o a d e r B u c k e t A s s e m b l y. This task covers removal, cleaning, inspection, and
installation of hoses, lines, and fittings located on the loader bucket assembly.
TOOLS: No. 1 Common Organizational Maintenance Tool Kit
Fixed open end wrench set
Socket wrench set, 3/8 inch drive
MATERIALS/PARTS: Clean cloths (Appendix C, item 1)
Cleaning solvent P-D-680 (Appendix C, item 2)
Detergent (Appendix C, item 3)
Hydraulic oil (Appendix C, item 13)
0-rings, four (FSCM 10988 PN 218-5007)
NOTE
PRELIMINARY PROCEDURE: Engine right side panels removed (page 9-14),
hydraulic reservoir drained (page 11-79), and hoses disconnected from
loader bucket tees (page 11-35).
REMOVAL (SHEET 1 OF 2)
NOTE
To prevent foreign matter from entering hydraulic system, plug and cap
tubes and hoses disconnected or removed in following steps.
11-58