TM 5-3805-262-20
11-3. LINES AND FITTINGS MAINTENANCE (CONT)
e. Control Valve Assembly to Lift Cylinder Assemblies (cont).
INSTALLATION (SHEET 1 OF 2)
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
I f n e c e s s a r y,
install new 0-ring (16) on two fittings (15).
I n s t a l l f i t t i n g s ( 1 5 ) i n c o n t r o l v a l v e a s s e m b l y l i f t s e c t i o n p o r t s.
Tighten securely.
Install tubes (13 and 14) in loader.
Loosely install four clamps (12), and two capscrews (11), lock washers
(10), and nuts (9).
Position tube (8) between tee located on tube (14) and fitting (15)
installed in lower lift section port of control valve assembly. If
necessary, adjust position of tube (14), then
fittings on both ends of tube (8) securely.
Position tube (7) between tee located on tube
s t a l l e d i n u p p e r l i f t s e c t i o n p o r t o f c o n t r ol
necessary, adjust position of tube (13), then
fittings on both ends of tube (7) securely.
Tighten nuts (9) securely.
connect and tighten
(13) and fitting (15) in-
valve assembly. If
connect and tighten
Install clamp on tube (8) and secure using capscrew, lock washer, and
nut. Tighten nut securely.
11-54