TM 5-3805-262-20
INSTALLATION (SHEET 2 OF 2)
(8)
( 9)
(10)
(11)
(12)
(13)
(14)
(15)
(16)
(17)
(18)
Behind left stop light, at slave receptacle, connect cable (7) to nega -
tive terminal using lock washer (15) and capscrew (14).
Connect cable (11) to top (positive) terminal using lock washer (15) and
capscrew (14).
Install new tie strap (16) around cables (7 and 11) at location noted
during removal.
Connect cables (11 and 12) to terminal (2) using capscrew (13) and nut
( 1 0 ) .
Connect cables (7 and 8) to terminal (4) using capscrew (9) and nut (6).
Install cable (5) terminals on battery posts and tighten terminal nuts .
A t r e a r b a t t e r y , i n s t a l l t e r m i n a l ( 4 ) w i t h p o s i t i v e c a b l e s o n b a t t e ry
post and tighten nut (3) .
At front battery, install terminal (2) with battery ground cables on bat -
t e r y p o s t a n d t i g h t e n n u t ( l ).
Spray cable terminals with electrical cleaner and allow to air dry. Then
s p r a y t e r m i n a l s w i t h e l e c t r i c a l s e a l e r .
Install engine left side panels (page 9-17).
C l o s e r a d i a t o r g r i l l e .
5-165