INSTALLATION (SHEET 3 OF 5)(m)(n)(o)(p)(q)( r )( s )( t )(u)TM 5-3805-262-20At hydraulic oil cooler, install elbow (25) in cooler port.Install flow switch (24) with port marked OUT connected to elbow (25).Connect flow switch three terminals (23) to wiring harness leads.Install connector (22) in IN port of flow switch (24).Route hose (5) between connector (22) and steering gear. Connect andtighten hose (5) fitting to connector (22).At sides of loader, install new 0-rings (19) on two elbows (18); installelbows in ports located at rod end of steering cylinder assemblies.Route hoses (17) as shown between elbows (18) and steering cylinder as-semblies port opposite rod end.At bottom sides of hydraulic tank , install new 0-ring (21) on tees (20).Install tees (20) in steering cylinder assemblies port opposite rod endp o r t.Connect and tighten hose (17) fitting to tee (20). Repeat for remaininghose (17).Route hoses (13 and 4) between tees (20) and steering gear.8-25
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business