TM 5-3805-262-34
4-3. TRANSMISSION MAINTENANCE
a. Transmission Torque Converter Group_.
This task covers removal, disassembly,
cleaning, inspection, reassembly, and installation of transmission torque converter
group.
TOOLS: No. 1 Common Organizational Maintenance Tool Kit
Retaining ring pliers
Safety glasses
Torque wrench, 1/2 inch drive
Mechanical puller kit
Vise
Vise jaw caps
Hand hammer, 16 ounces
Automotive Mechanic-s Tool Kit
Socket wrench set, 1/2 inch drive
Hand hammer, 8 ounces
Putty knife
Drive pin punch, 1/8 inch point
Drive pin punch, 1/4 inch point
Pry bar
Cold chisel, 3/4 inch
Wood blocks, two, 2 by 4 by 8 inches
Hydraulic press
Sleeve, 3-1/2 inches outside diameter
Sleeve, 1-3/4 inches outside diameter
Sleeve, 2-1/2 inches outside diameter
Channel lock pliers
Transmission repair stand
Studs, two, 1/4-28 by 1 inch long
MATERIALS/PARTS: Clean cloths (Appendix C, item 1)
Cleaning solvent P-D-680 (Appendix C, item 2)
Non-hardening sealant (Appendix C, item 10)
Lubricating oil (Appendix C, item 15)
Oil-soluble grease (Appendix C, item 26)
Transmission gasket kit (FSCM 73342 PN 6838897)
NOTE
PRELIMINARY PROCEDURE: Transmission removed from loader (page 3-330) and
transmission securely fastened in suitable repair stand.
REMOVAL (SHEET 1 OF 3)
(1)
Remove six capscrews (1) and retaining plate (2).
(2) Remove three flex plate disks (3) and flex plate disk (4).
(3) Remove and discard 24 lock nuts (5).
4-94