TM 5-3805-262-34
3-22. CONTROL VALVE ASSEMBLY MAINTENANCE (CONT)
a. Control Valve Assembly (Cont).
INSTALLATION (SHEET 7 OF 7)
(25) If necessary,
install nuts (8) and clevis (9) on ends of control rods (5
through 7).
(26) Position lift control rod (5) between bellcranks and control valve assem-
bly lift spool. If necessary, thread clevis
farther on or off control
rod until clevis mounting holes are alined with associated holes in
bellcrank and spool.
(27) Install clevis pins (4 and 2) and cotter pins (3 and 1) to secure lift
control rod (5).
(28) Repeat steps (26) and (27) to in-
stall remaining control rods (6
and 7).
(29) Adjust control levers and link-
ages (page 3-718).
(30) Check main relief valve pressure
setting and adjust as necessary
(page 3-616) .
LEGEND
1. Cotter pins (3)
2. Clevis pins (3)
3. Cotter pins (3)
4. Clevis pins (3)
5. Lift control rod
6. Tilt control rod
7. Clam control rod
8. Nuts (6)
9. Clevis (6)
3-660