TM 5-3805-262-34INSTALLATION (SHEET 6 OF 7)LEGEND10. Clam cylinder tube11. Fitting12. Tilt cylinder tube13. Lift cylinder tube(20) Connect and tighten other lift cylinder tube (13) between fitting in-stalled in upper rear port of control valve assembly and tee fitting atcenter of loader.(21) Connect and tighten other tilt cylinder tube (12) to fitting installed inupper middle port of control valve assembly and tee fitting at center ofloader.(22) Install other clam cylinder tube (10) through right side of loader andconnect to fitting installed in upper front port of control valve assem-bly. Tighten clam cylinder tube fitting.(23) Install capscrew, clamp, lock washer, and nut to fasten clam cylindertube (10) to front chassis on right side of loader.(24) Connect and tighten hose fitting (11) to clam cylinder tube (10).3-659
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business