TM 5-3805-262-34
INSTALLATION (SHEET 6 OF 7)
LEGEND
10. Clam cylinder tube
11. Fitting
12. Tilt cylinder tube
13. Lift cylinder tube
(20) Connect and tighten other lift cylinder tube (13) between fitting in-
stalled in upper rear port of control valve assembly and tee fitting at
center of loader.
(21) Connect and tighten other tilt cylinder tube (12) to fitting installed in
upper middle port of control valve assembly and tee fitting at center of
loader.
(22) Install other clam cylinder tube (10) through right side of loader and
connect to fitting installed in upper front port of control valve assem-
bly. Tighten clam cylinder tube fitting.
(23) Install capscrew, clamp, lock washer, and nut to fasten clam cylinder
tube (10) to front chassis on right side of loader.
(24) Connect and tighten hose fitting (11) to clam cylinder tube (10).
3-659