TM 5-3805-262-343-23. CONTROL LEVERS AND LINKAGES MAINTENANCEThis task covers removal, disassembly, cleaning, inspection, reassembly, installa-tion, and adjustment of control valve assembly control levers and linkages.TOOLS: No. 1 Common Organizational Maintenance Tool KitSafety glassesScrewdriverSocket wrench set, 3/8 inch driveCombination box and open end wrench setLubricating kitAutomotive Mechanic’s Tool KitDrive pin punch, 3/8 inch pointMachinist’s steel ruleMultiple folding ruleHand hammer, 2 poundsDiagonal cutting pliersMATERIALS/PARTS: Clean cloths (Appendix C, item 1)Cleaning solvent P-D-680 (Appendix C, item 2)Detergent (Appendix C, item 4)Grease (Appendix C, item 7)PERSONNEL REQUIRED: Two Construction Equipment Mechanics MOS 62BREFERENCE: LO 5-3805-262-12REMOVALa.b.c.d.e.f.g.3-708NOTEPRELIMINARY PROCEDURE: Loader turned fully left.At control valve assembly, remove three cotter pins (1) and clevis pins(2).Just above control valve assembly, remove three cotter pins (3) and clevispins (4).Remove lift arm control link rod (5), bucket tilt control link rod (6), andclam control link rod (7).If necessary, loosen nut (8) and loosen and remove clevis (9). Remove nut(8). Repeat above to remove remaining nuts (8) and clevis (9).Inside cab, loosen and remove six nuts (10), lock washers (11), screws(12), and washers (13). Remove control cover (14) from cab.At bottom of control support, loosen and remove four nuts (15), lockwashers (16), washers (17), capscrews (18), and washers (19).Grasp control support with assembled parts, lift from cab deck, and removefrom cab.
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business