6
TM 5-3805-290-23-2
THIS WORK PACKAGE COVERS
Valve Cover: Removal, Cleaning and Inspection, Installation
INITIAL SETUP
Maintenance Level
Materials/Parts - Continued
Oil, lubricating, OE/HDO-15/40 (Item 35, WP
Unit
O-ring
Tools and Special Tools
Personnel Required
MOS 62B, Construction Equipment Repairer
Shop equipment, common no. 1 (Item 77, WP 0205
References
TM 5-3805-290-10
Equipment Conditions
Materials/Parts
Air hose between turbocharger and air cleaner
Cleaning compound, solvent, type III (Item 9, WP
Drawings Required
Oil, lubricating, OEA-30, Arctic (Item 32, WP
TM 5-3805-290-23P, Figure 7
Estimated Time to Complete Task
Oil, lubricating, OE/HDO-5/40 (Item 34, WP 0206
1.3 hr