TM 5-3805-290-23-2
HYDRAULIC/TRANSMISSION OIL COOLER REPLACEMENT
THIS WORK PACKAGE COVERS
Removal, Installation
INITIAL SETUP
Maintenance Level
Materials/Parts - Continued
Unit
Tools and Special Tools
O-ring (4)
Personnel Required
Shop equipment, common no. 1 (Item 77, WP 0205
MOS 62B, Construction Equipment Repairer (2)
Equipment Conditions
Materials/Parts
Machine parked on level ground (TM 5-3805-290-
10)
Work tool lowered to ground (TM 5-3805-290-10)
Cleaning compound, solvent, type III (Item 9, WP
Parking brake engaged (TM 5-3805-290-10)
Wheels chocked
Oil, lubricating, OEA-30, Arctic (Item 32, WP
Battery disconnect switch in OFF position (TM 5-
3805-290-10)
Hydraulic system pressure relieved (TM 5-3805-
Oil, lubricating, OE/HDO-40 (Item 33, WP 0206
290-10)
Drawings Required
Oil, lubricating, OE/HDO-5/40 (Item 34, WP 0206
TM 5-3805-290-23P, Figures 72 and 94
Estimated Time to Complete Task
Oil, lubricating, OE/HDO-15/40 (Item 35, WP
2.5 hr