• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
RIDE CONTROL ACCUMULATOR MAINTENANCE - CONTINUED
Nitrogen Charging Procedure

Manual 2 Loader, Light, Scoop: 2.5 Cubic Yard Multipurpose (Mp) Clamshell Bucket, Diesel Engine Driven (Ded), 4-Wheel Drive Model 924G
Page Navigation
  575    576    577    578    579  580  581    582    583    584    585  
img
TM 5-3805-290-23-2
RIDE CONTROL ACCUMULATOR MAINTENANCE - CONTINUED
0127 00
TESTING AND CHARGING - CONTINUED
Discharging Ride Control Accumulator - Continued
6.
Remove two bolts (10) from nitrogen charging valve
guard (11).
7.
Remove guard (11) from nitrogen charging valve (12).
8.
Remove protective cap (13) from nitrogen charging
valve (12).
N OT E
If damaged, replace nitrogen charg-
ing valve and O-ring.
Other end of hose assembly will
remain open.
427-B1028-1
9.
Connect hose assembly (14) to nitrogen charging chuck (15).
10.
Turn valve handle (16) on nitrogen charging chuck (15) counterclockwise. This will ensure nitrogen charging valve (12)
will not be opened when nitrogen charging chuck is attached.
11.
Connect nitrogen charging chuck (15), extension
assembly, and hose assembly (14) to nitrogen charging
valve (12).
12.
Place open end of hose assembly (14) away from work
area.
13.
Turn handle (16) on nitrogen charging chuck (15)
fully clockwise to open nitrogen charging valve (12).
This will release all compressed gas from accumulator
(2) through hose assembly (14).
14.
Remove nitrogen charging chuck (15) from nitrogen
charging valve (12).
15.
Install protective cap (13) on nitrogen charging valve
(12).
427-B1029
0127 00-7


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.