• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
RIDE CONTROL ACCUMULATOR MAINTENANCE - CONTINUED
RIDE CONTROL ACCUMULATOR MAINTENANCE - CONTINUED

Manual 2 Loader, Light, Scoop: 2.5 Cubic Yard Multipurpose (Mp) Clamshell Bucket, Diesel Engine Driven (Ded), 4-Wheel Drive Model 924G
Page Navigation
  572    573    574    575    576  577  578    579    580    581    582  
img
. . .
TM 5-3805-290-23-2
RIDE CONTROL ACCUMULATOR MAINTENANCE - CONTINUED
0127 00
INSTALLATION
1.
Place clamp (8) and accumulator (2) in position and loosely install two washers (7) and nuts (6) on accumulator clamp.
2.
Place accumulator (2) in position and install three washers (5) and bolts (4) on top of accumulator.
3.
Tighten two nuts (6) on clamp (8).
4.
Lubricate new O-ring (3) with thin coat of clean oil and install on line (1).
5.
Connect line (1) to accumulator (2).
6.
Check ride control accumulator (2) for proper precharge. Refer to Testing and Charging in this work package.
7.
Install left chassis guards (WP 0107 00).
8.
Install left ladder (WP 0106 00).
9.
Install washer bottle (WP 0118 00).
WAR N I N G
Before operating equipment, secure the steering frame lock in the stowed position. DO NOT operate
machine with steering frame lock connected. Failure to lock steering frame lock into the stowed position
before operating can result in loss of steering and injury or death to personnel.
10.
Secure steering frame lock in stowed position (TM 5-3805-290-10).
427-B0786
427-B1022
427-B1024
0127 00-4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.