TM 5-3805-290-23-2
IMPLEMENT PUMP HOSES, LINES, AND FITTINGS REPLACEMENT - CONTINUED
0135 00
INSTALLATION
1.
N OT E
Apply a thin coat of clean oil to all O-rings before installation.
2.
Install new O-ring (25) and fitting (23) on implement pump (5).
3.
Install new O-ring (24) and connect hose (22) to fitting (23).
4.
5.
Install new O-ring (21) and position hose (20) on implement pump (5) and install two flange halves (19), four washers
(18), and bolts (17).
6.
Install new O-ring (16) and fitting (15) on implement pump (5).
7.
Install new O-ring (13) and connect hose (12) to fitting (15).
8.
Install new O-ring (14) and fitting (10) on implement pump (5).
9.
Install new O-ring (13) and connect hose (12) to fitting (10).
10.
Install fitting and connect hose (9) to hydraulic tank (WP 0140 00).
11.
Install new O-ring (11) and connect hose (9) to fitting (10).
12.
Install fitting and connect hose (8) to hydraulic tank (WP 0140 00).
13.
Connect hose (8) to implement pump (5) and tighten two clamps (7).
14.
Install fitting and connect hose (4) to hydraulic tank (WP 0140 00).
15.
Install new O-ring (6) and position hose (4) on implement pump (5) and install two flange halves (3), four washers (2),
and bolts (1).
0135 00-4