• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
PILOT SYSTEM HOSES, LINES, AND FITTINGS REPLACEMENT - CONTINUED
PILOT SYSTEM HOSES, LINES, AND FITTINGS REPLACEMENT - CONTINUED

Manual 2 Loader, Light, Scoop: 2.5 Cubic Yard Multipurpose (Mp) Clamshell Bucket, Diesel Engine Driven (Ded), 4-Wheel Drive Model 924G
Page Navigation
  651    652    653    654    655  656  657    658    659    660    661  
img
. . . . . .
TM 5-3805-290-23-2
PILOT SYSTEM HOSES, LINES, AND FITTINGS REPLACEMENT - CONTINUED
0136 00
INSTALLATION
1.
Install all fittings and connect all hoses to main control valve (WP 0134 00).
2.
Install all fittings and connect all hoses to coupler valve (WP 0190 00).
3.
Install all fittings and connect all hoses to combination valve (WP 0124 00).
4.
Install all fittings and connect all hoses to implement relief valve (WP 0125 00).
N OT E
Apply a thin coat of clean oil to all O-rings before installation.
5.
Install ten new O-rings and fittings on hydraulic manifold (7).
6.
Connect hose (34) to hydraulic tank (WP 0140 00).
7.
Install new O-ring (35) and position hose (34) on hydraulic manifold (7) and install two flange halves (33), four washers
(32), and bolts (31).
8.
Connect hose (27) to implement relief valve (WP 0125 00).
9.
Install new O-ring (30) and fitting (28) on hydraulic manifold (7).
10.
Install new O-ring (29) and connect hose (27) to fitting (28).
427-B1226-1
0136 00-5


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.